Planning poker doesn't need to be a marathon. Most sessions drag because teams confuse estimation with implementation planning. You're not building the feature—you're just sizing it.

With proper preparation and ruthless time-boxing, you can estimate 5-8 stories in 15 minutes. Here's exactly how to do it.

Key insight: Speed comes from preparation, not rushing. The actual voting takes seconds. The setup is where you save time.

The Fast Format

This works for teams estimating 5-8 stories. Each story gets roughly 2 minutes max:

  • 30 seconds: PO reads the story
  • 15 seconds: Team picks cards
  • 60 seconds: Discuss (only if needed)
  • 15 seconds: Final estimate or re-vote

Rules for Speed

Non-Negotiable
  • If discussion goes past 90 seconds, send the story to the parking lot
  • Only outliers (highest/lowest) get to explain their estimates
  • Two voting rounds max. After that, take the pessimistic estimate
  • No implementation debates. Estimate complexity, not solutions
  • Timer is visible. When it beeps, voting closes
⏱️

15-Minute Agenda

min0

Quick intro & rules reminder

1 min

Led by: Facilitator

min1

Estimate 5-8 stories

10 min

Led by: Team

min11

Parking lot review

2 min

Led by: Team

min13

Confirm estimates & next steps

2 min

Led by: Product Owner

Total time: 15 minutes for 5-8 stories. Anything that doesn't fit gets moved to the parking lot for async discussion.

Preparation Checklist

90% of session speed comes from what happens before the timer starts. Use this checklist:

1
Stories refined and prioritizedBefore session
Owner: Product Owner
2
Acceptance criteria clear and conciseBefore session
Owner: Product Owner
3
Dependencies identifiedBefore session
Owner: Product Owner
4
Team has read storiesBefore session
Owner: Team
5
Room/tool ready to goBefore session
Owner: Facilitator
6
Timer visible to everyoneDuring session
Owner: Facilitator
7
Parking lot for complex itemsDuring session
Owner: Facilitator
8
Estimates recorded immediatelyDuring session
Owner: Facilitator
💡

Time-Saving Tips

Pre-refine Stories

Product Owner clarifies acceptance criteria before the session. No one should see a story for the first time in planning poker.

Saves 5-7 minutes

Use a Timer

Set a visible 2-minute countdown for each story. When it hits zero, move on. Discussion can continue in the parking lot.

Prevents runaway debates

Limit Stories

Only estimate what fits in the upcoming sprint. Estimating the entire backlog is a different meeting.

Saves 10+ minutes

Ban Laptops (Except Facilitator)

No multitasking. Eyes on the story. Phones face down. Full attention makes everything faster.

Doubles focus

Use Templates for Story Intros

PO uses the same format every time: "As a [user], I want [feature], so that [benefit]." No rambling.

Saves 1-2 min per story

Defer Complex Stories

If estimates include "?" or coffee cups, send it back. You don't have time for unknowns.

Prevents 10+ min detours
⏭️

What to Skip

Fast planning poker means knowing what not to do. These things slow you down without adding value:

⏭️

Skip: Perfect Consensus

Do this instead: If estimates are within 1-2 Fibonacci steps, pick the higher one and move on.

🚫

Skip: Detailed Discussions

Do this instead: Save technical implementation debates for after. Just estimate complexity.

🤐

Skip: Explaining Every Card

Do this instead: Only ask outliers (highest/lowest) to explain. Everyone else stays quiet.

📖

Skip: Re-reading Acceptance Criteria

Do this instead: Team should have read stories before the session. No live reading.

🎨

Skip: Bikeshedding Small Details

Do this instead: Button color doesn't affect the estimate. Focus on scope and complexity.

🔄

Skip: Multiple Re-estimates

Do this instead: Two rounds max. If no convergence, take the pessimistic estimate.

🎬

Sample Fast Session

00:00 - Facilitator kicks off:

“We have 6 stories, 15 minutes. Timer is visible. Outliers speak first. If we can't converge in two rounds, we take the high estimate. Let's go.”

01:00 - PO reads first story:

“As a user, I want password reset via email so I can recover my account. Acceptance criteria: email sent within 30 seconds, link expires in 1 hour, works on all providers.”

01:30 - Team votes:

Cards revealed: 3, 5, 5, 5

“Person who said 3: why lower?” → “We have the email service already.”
“Fair. Anyone disagree?” → Silence.
“Estimate is 5. Next story.”

02:30 - Story 2 voted, consensus immediately:

Cards: 2, 2, 3, 2 → Estimate is 3 (take the high). No discussion needed.

03:00 - Story 3 has wide spread:

Cards: 3, 8, 13, 8

Discussion reveals missing dependency. After 90 seconds, still no consensus.
“Parking lot. We'll clarify async and re-estimate later. Next story.”

Result:

5 stories estimated in 12 minutes. 1 deferred for clarification. Team has 3 minutes back.

The Bottom Line

Fast planning poker isn't about cutting corners. It's about eliminating waste. When stories are pre-refined, acceptance criteria are clear, and the team stays focused, 15 minutes is plenty.

The timer isn't the enemy. It's a forcing function that keeps discussions crisp and prevents bikeshedding. Respect the clock, trust the process, and watch your velocity improve.

Try the 15-Minute Format

Set up a room with a visible timer. Estimate fast, estimate smart.

Create Free Room